Single sided formwork system , tunnel formwork for Singapore MRT project
Descrition:
Singapore MRT project, include 2 tunnels and 2 stations, the tunnel length 754 mater and 745 maters, diameter is 6.6 maters. The retaining wall for station is 6 meters.
Specifications:
Single-side formwork system, tunnel formwork are applied in this project. The detail is below:
Single sided formwork system , tunnel formwork for Singapore MRT project